News Archive
Reducing costs for power curve measurements:
Site calibration performed with LiDAR
The project was executed in preparation of the certification measurements for the new DW61-900 kW wind turbine by Emergya Wind Technologies (EWT), a product which builds on EWT’s market leading position in the distributed wind sector. Ecofys WTTS from the Netherlands, together with its accredited partner windtest grevenbroich GmbH from Germany, conducted the site calibration using two WindCube-V2 LiDARs. The calibration showed that the site is suitable for certification measurements by validating an appropriate measurable sector. The measurement campaign and subsequent LiDAR verification were approved by the certification body.
This project underlines that LiDAR technology has further matured and that LiDARs can deliver data according to IEC quality standards. The project also shows that Ecofys WTTS and windtest grevenbroich GmbH bring innovative and smart solutions to leading and innovative clients.
Zurück