windtest grevenbroich celebrates 20-year anniversary of test field
(Grevenbroich, 4 June 2018) It was twenty years ago, on 1 June 1998, that windtest grevenbroich gmbh (wtg) put the Dewind D4 prototype into operation on its test field south of Grevenbroich. Today, wtg looks back on a 20-year history of its wind turbine test field.
weiterlesenTÜV Rheinland Certifies Prototype Vertical System from Directtech
TÜV Rheinland has provided a prototype certificate to Directtech, an energy systems manufacturer based in Moers.
weiterlesenJoin us for the industry’s most important event!
weiterlesen
Reducing costs for power curve measurements:
Site calibration performed with LiDAR
weiterlesenVisit us at our stand N10
weiterlesen