News Archive

windtest grevenbroich celebrates 20-year anniversary of test field

Montag, 04. Juni 2018

(Grevenbroich, 4 June 2018) It was twenty years ago, on 1 June 1998, that windtest grevenbroich gmbh (wtg) put the Dewind D4 prototype into operation on its test field south of Grevenbroich. Today, wtg looks back on a 20-year history of its wind turbine test field.

weiterlesen

TÜV Rheinland Certifies Prototype Vertical System from Directtech

Donnerstag, 13. April 2017

TÜV Rheinland has provided a prototype certificate to Directtech, an energy systems manufacturer based in Moers.

weiterlesen

Join us for the industry’s most important event!

Mittwoch, 23. März 2016

weiterlesen

Reducing costs for power curve measurements:

Donnerstag, 19. November 2015

Site  calibration performed with LiDAR

weiterlesen

Visit us at our stand N10

Mittwoch, 02. September 2015

weiterlesen
Seite 3 von 4